03 / PILOT ACCEPTANCE PLAN
Seven verifiable pilot gates
Proposed criteria, not an OEM-approved device specification. Metric thresholds, reference hardware, protocols and safety ownership must be agreed before the pilot.
A01
ARM64 native build
OPENBuild C++ and Rust on ARM64 Linux; record toolchain versions and artifact hashes.
Pass criterion: Build and unit tests PASS; architecture verified
A02
POC4 / C++ ↔ Rust
OPENExercise 14 operations and invalid frames, dead worker, timeouts, identity and restart.
Pass criterion: No unintended execution; all negative cases reproduced
A03
Debian / systemd
OPENRun separate service on agreed Linux test target with minimum privilege.
Pass criterion: Cgroup/recovery, permissions and journal documented
A04
PREEMPT_RT / timing
OPENMeasure under agreed load profile; define timing budgets with OEM before testing.
Pass criterion: p95/p99, worst-case and jitter within agreed bounds
A05
CAN / Hardware Boundary
OPENVersioned CAN/device protocol, unknown outcomes and no unsafe retries.
Pass criterion: Fault injection, reconciliation and safe-stop lab verified
A06
HIL / Non-clinical
OPENWater/reference solutions, defined pump and sensor failure paths, independent emergency stop.
Pass criterion: Physical outputs safe under process/power failure
A07
QA / Traceability
OPENRequirements → risks → tests → evidence; track findings in review.
Pass criterion: Reviewed evidence matrix and go/no-go, not regulatory clearance