Health, readiness and controlled degradation in integration platforms

A process can be alive while a critical dependency prevents safe operation. MEMM therefore treats liveness, readiness, dependency state and controlled degradation as separate operational concepts whose exact behavior is release- and deployment-specific.

Topics:LivenessReadinessDegraded ModeDependenciesOperations
The key relationship

Alive does not automatically mean ready

  • Liveness

    Is the process running?

  • Readiness

    Do critical dependencies allow the operation?

  • Bounded operating state

    Ready, degraded or unavailable

Liveness and readiness use different criteria per release and deployment.

Three runtime states answer three different questions

  • Liveness: the process is reachable and sufficiently active to respond to liveness checks.
  • Readiness: critical dependencies for the configured work scope are usable.
  • Degraded: processing may continue with explicit restrictions even if a noncritical boundary is impaired.

Why readiness is not an SLA

A ready state is a point-in-time observation of configured runtime boundaries, not a contractual availability promise or proof that external providers, complete business journeys, user experience or regulatory requirements are satisfied.

Service-wide operational duties

For HCC, the operational boundary includes distributed workloads, monitoring of cloud-service calls, capacity management and testing HCC-stack changes. Service providers and workload manufacturers each have assigned duties. These requirements cannot be inferred from one runtime readiness signal (gemSpec_HCC 1.0.0, A_29664–A_29666, A_29678).

Versioned primary sources

What this page explicitly does not claim: This page describes operational design principles. It does not claim a specific SLA, availability percentage, monitoring product or production deployment topology.